If you were Registered and logged in, you could reply and use other advanced thread options
|
Posted by Pati, in Phx on October 11, 2009, 12:55 pm
Let's see...
Need to finish the PJ bottoms for the class I am teaching tomorrow.
Have to get the last 2 borders on a class sample so we can get pics by
Tues. And another class sample top cut and pieced for same.
Then there is the radiant sunshine and shadows top that is in progress
(strip sets sewn together, need to press cut and make 9-patches then
set the top together.
Have the supplies for a bag I am designing, pattern is mostly written,
need to do diagrams for it.
And make a few "in progress" examples for a couple of upcoming
classes.
show/hide quoted text
Then I need to decide on future class projects. <G>
For hand work I have the project for the challenge for one of my
groups, probably a second one for another group (have to decide what I
show/hide quoted text
want to do..... but it is only a block. <G>) Always my DearJane to
hand quilt when it gets a bit cooler, and the ever-present mini
wholecloth I am hand quilting. (Have several of these to do to keep in
practice, and when I don't want to have to think about what to do.
show/hide quoted text
<G> ) Need to get back to my Quilted Diamonds and the second DJ I have
in progress too.
Eventually I will get a bunch of other things done...... always seems
to be a difference in what I want to do, versus what I have the energy
and initiative to get done. sigh.
Pati, in Phx
show/hide quoted text
> What project is on your sewing table... =A0in your machine or in your lap
> right now.
> Me -- I just finished binding a lap sized kitty quilt (Darcy Aston appliq=
u=E9
show/hide quoted text
> patterns).
> I have another baby quilt that needs the label.
> And I have 13 small quilts (6" x 9") to bind. =A0They are a Santa and num=
bers
show/hide quoted text
> for Calendar (1 & 2 repeat). =A0They will hang from a tabletop rack as a
> countdown to Christmas.
> So that's the handwork for the Family Room.
> On the machine is a paper-pieced circular quilt -- now I'm trying to add =
the
show/hide quoted text
> corners to square it out. =A0It's called St. Mark's Wall hanging - you ca=
n see
show/hide quoted text
> it here:http://www.bellabellaquilts.com/shop.html
> It's in green & white and black for hubby's new office at Michigan State
> University.
> Your turn....
> --
> Kate in MIhttp://community.webshots.com/user/K_Groves
|
|
Posted by Maureen Wozniak on October 11, 2009, 6:01 pm
On Sat, 10 Oct 2009 13:26:55 -0500, Kate in MI wrote
show/hide quoted text
> What project is on your sewing table... in your machine or in your lap
> right now.
>
> Me -- I just finished binding a lap sized kitty quilt (Darcy Aston appliqué
> patterns).
>
> I have another baby quilt that needs the label.
>
> And I have 13 small quilts (6" x 9") to bind. They are a Santa and numbers
> for Calendar (1 & 2 repeat). They will hang from a tabletop rack as a
> countdown to Christmas.
>
> So that's the handwork for the Family Room.
>
> On the machine is a paper-pieced circular quilt -- now I'm trying to add the
> corners to square it out. It's called St. Mark's Wall hanging - you can see
> it here:
> http://www.bellabellaquilts.com/shop.html
>
> It's in green & white and black for hubby's new office at Michigan State
> University.
>
> Your turn....
>
>
>
I have a nine patch top that needs to be layered and quilted.
David needs a baby quilt for his new nephew so I've got a cute panel which
I'm just going to quilt up. I found the perfect fabric for the backing on
the shop hop, so I need to get that going.
The pieces for a "Wonderful 1 Fabric quilt" (from the book by the same name)
is on my design wall and I'm hoping to get all the blocks pieced together in
the next day or so.
I'm handquilting my bluework teapots.
And I've got the fabric and pattern for a dress for me. Fabric is being
prewashed right now.
That's just the stuff I'm hoping to get to in the near future. I also have a
laundry basket full of projects to make, projects that need to be finished,
etc.
Maureen
|
|
Posted by Mary in Rock Island IL on October 11, 2009, 10:54 pm
show/hide quoted text
>What project is on your sewing table... in your machine or in your lap
>right now.
<SNIP>
show/hide quoted text
>Your turn....
What I am actually working on right now is the first of 5 to 6
graduation quilts needed for this spring. The top is now pieced, it
needs borders, basting, quilting and binding. Repeat. (And this is
kind of a surprise so no mention on FB please).
I also have 5 leaf blocks for my guild's block to raffle which I need
to make before early November. And the September Carol Doak BOM did
not quite get done yet.
There is my long term 1000 Pyramid hand piecing project. It has been
on campus visits most recently as my DD tries to decide where to
apply.
And then I have some quilts to tie for my guild's charity projects,
the threads are strung so it is all about tying, trimming and
delivering them to a member of my binding team.
We (that would be the royal we) are not talking about any other
partially completed project which might be sittting in one of my in
progress bins. Nor are we discussing anything I have in mind but not
actually started. Soon we will need to discuss the wall hanging which
I need for mid December...
Mary
|
|
Posted by Dr. Zachary Smith on October 12, 2009, 10:50 am
show/hide quoted text
> What project is on your sewing table... =A0in your machine or in your lap
> right now.
Most projects have been temporarily suspended on account of Fudge,
except for my pseudo-crazy quilt, which I have tentatively committed
(pledged, anyway) to try to have finished (yeah, weasle-words if ever
they were...) by 2012.
Spent the weekend figiting with the first embroidery pattern (Bernina
Designer v2.0 - yech! - I hope v6 is worth updating to.)
I'm supposed to learn how to iron, cut & square off my foundation this
evening...
Doc
|
|
Posted by Polly Esther on October 12, 2009, 11:48 am
Be sure to save some room for trimming a 2nd time. The foundation will
shrink, stretch and warp - and that's just the good news. Polly
show/hide quoted text
"Dr. Zachary Smith" <wrote>
Most projects have been temporarily suspended on account of Fudge,
except for my pseudo-crazy quilt, which I have tentatively committed
(pledged, anyway) to try to have finished (yeah, weasle-words if ever
they were...) by 2012.
Spent the weekend figiting with the first embroidery pattern (Bernina
Designer v2.0 - yech! - I hope v6 is worth updating to.)
I'm supposed to learn how to iron, cut & square off my foundation this
evening...
Doc
|
Page 7 of 9 < 1 2 3 > last >>
| Similar Threads | Posted | | Check in time | August 2, 2008, 10:05 am |
| Check Your Attitude | March 1, 2008, 5:07 am |
| Stash check?? | March 3, 2008, 1:00 am |
| QI check list | March 3, 2008, 10:51 pm |
| Re: quick check-in | May 14, 2008, 8:39 am |
| Re: OT: quick check-in | May 14, 2008, 4:14 pm |
| OT: Check this out!! (specially *J*) | October 19, 2009, 10:23 pm |
| Need A Logo Design? Check this out! | April 9, 2007, 6:37 pm |
| Need A Logo Design? Check this out! | April 10, 2007, 3:58 pm |
| Activity check -- or How many posts? | June 1, 2007, 5:37 pm |
|
|